A couple bores are eg shaped one had broken bushing and allowed the bore to be beaton just over sized enough to hold the new bushing. That's the one I welded. I could change the welded bushing again but will likely never have to since the machine wont last another 10k. Weve got just under 11k on it.
Should have a shop do this but wed be a few grand in labor. A welding machine can be the tool that makes most things work.
I've got 3 bushings to go. They're fighting me. Mostly the egshaped bores. Hoping to go back together Monday when theres two of us. I dont think I want to put the swing tower and boom on alone.
A couple bores are eg shaped one had broken bushing and allowed the bore to be beaton just over sized enough to hold the new bushing. That's the one I welded. I could change the welded bushing again but will likely never have to since the machine wont last another 10k. Weve got just under 11k on it.
Should have a shop do this but wed be a few grand in labor. A welding machine can be the tool that makes most things work.
I've got 3 bushings to go. They're fighting me. Mostly the egshaped bores. Hoping to go back together Monday when theres two of us. I dont think I want to put the swing tower and boom on alone.