Pristine CTD. Extra cab, short bed, 2wd, SLT. Factory tow/haul package, leather heated seats, heavy insulation package. Rebuilt HX 35/40, Dap injectors, full gauges, PacBrake, Dynamic Transmission vb/servos/accumulator/strut/band/triple disc. Soft tranny lines, 40k trans cooler, lift pump, gooseneck hitch (never used), class 5 tow hitch, tonneau cover, air bags, re- geared to 3.73’s, 3rd Gen brakes with 17" rims Rust free CA truck located in Chico CA, 100 miles north of Sacto. I built this to
-
Price: 16000
-
Location: Chico CA 95973
As the title says I am in need of designing a schedule for 5 day work week 2 shifts 10 hour each.4 mechainics,2 welders and 2 electricians per shift, 1 supervisor to rotate with each shift and work 4 10's as well with 2 fill in supervisors "One of which may be 1 of the 8 workers on that shift to make it even more difficult" to fill in for regular supervisors1 day per week per shift off. need it to work out so all will work 40 hours a week and there will always need to be a minimum 3 mechanics and 1 each electrician and welder scheduled for all 5 days.I think a rotating day off every week is the most fair way also, example would be monday off this week next week one would get tuesday off and so forth.need to cover 2 shifts 5 days a week with the numbers listed above. I am not good at designing things like this and tried many searches online to no avail unless I want to hire a company to design or buy a schedule.Does anyone have any ideas to make this scenario work? Need to have it figured out before the first of the year when the company goes to a 5 day 2 ten hour shift work week.