Pristine CTD. Extra cab, short bed, 2wd, SLT. Factory tow/haul package, leather heated seats, heavy insulation package. Rebuilt HX 35/40, Dap injectors, full gauges, PacBrake, Dynamic Transmission vb/servos/accumulator/strut/band/triple disc. Soft tranny lines, 40k trans cooler, lift pump, gooseneck hitch (never used), class 5 tow hitch, tonneau cover, air bags, re- geared to 3.73’s, 3rd Gen brakes with 17" rims Rust free CA truck located in Chico CA, 100 miles north of Sacto. I built this to
-
Price: 16000
-
Location: Chico CA 95973
I decided to rewire the engine compartment a few weeks ago. I cut every wire in there and took every piece of black tape and ribbed sheathing off and have been left with nothing but wires. My plan is to put the PCM/Fuse Box/Grid Heater Relay on the hood, right on the back drivers side corner. I don't think there will be any issue with slamming the hood and everything getting shock absorption. I have some plans to absorb it a little anyways, though I don't think anything will happen. The initial plan was just to take the ribbed sheathing crap off in lieu of braided nylon sheathing, like what the cruise control has on it going to the throttle. I was going to put it on every single wire. After looking at it some more, I decided to redo everything, every part of routing it. By putting the pcm on the hood, I can get rid of the entire loom that runs along the top of the firewall. I starred at it some more and realized I can get rid of the entire loom that runs along the top of the engine next to the valve covers. There will be hardly any wires on it now and they will be hidden. I am going to use the fuse box for now, but I have plans on getting rid of that big piece of crap as well. This thing has taken me a long time because of how many wires there are and how to run them and where to run them and.... but I finally got one ran to the passenger side headlight lol. I have been working a lot so I don't have much time to work on this thing but I am going to aim for one connection a night now, be done by 2012