Pristine CTD. Extra cab, short bed, 2wd, SLT. Factory tow/haul package, leather heated seats, heavy insulation package. Rebuilt HX 35/40, Dap injectors, full gauges, PacBrake, Dynamic Transmission vb/servos/accumulator/strut/band/triple disc. Soft tranny lines, 40k trans cooler, lift pump, gooseneck hitch (never used), class 5 tow hitch, tonneau cover, air bags, re- geared to 3.73’s, 3rd Gen brakes with 17" rims Rust free CA truck located in Chico CA, 100 miles north of Sacto. I built this to
-
Price: 16000
-
Location: Chico CA 95973
Since the VNT plan went TU I am going another route. It’s a little more money, but hey that happens :-)
I got a killer deal on a set of DDP 50's, one that I couldn't refuse. Nozzles were always part of the plan, but never in the immediate budget, but like I said I couldn't refuse these.
I have wanted a different turbo for a while, as the VNT indicated. My main goal for a new turbo was to reduce the insane back-pressure created by the stock turbine housing and wheel. I don't need much more out of the compressor side, just more efficient. I am trying to decide between a Garrett Stage 2 or a modified Stage 3. The two turbos both have the same turbine and turbine housing; just the compressor wheels are different. One is a 60/80 the other is a 64/88. Both are water-cooled ball bearing units and should spool very fast and provide 35-40 psi of boost with low drive pressure.
To ease my mind when the boost goes near 40 I am also going to be installing a set of ARP 425's. Most say I don't need them at my boost levels, but I don't want to find out the $$ way I need them.
I will also be installing a set of manifold and turbo blankets. They will improve spool even more, and keep underhood temps down.
Lastly, if there is any funding remaining, I will be getting an Edge Insight to monitor my OBDII readings, post-turbo EGT's, and oil pressure.
The goal is to be done with wrenching by the 1st week of April, I have a busy schedule from now until the middle of March, so it will mostly be parts gathering for the next month and a half then wrenching.