On a hot engine, I can do it in under 1 hour. Ask @hex0rz . He showed up at my place at 6pm and had him rolling with my spare set by 7pm heading south. I will admit I didn't get #2 line tight enough a
-
I wouldn't beat myself up about how long it took me as much as I would if it wasn't done properly. Take all the time you need the first time...9 hours is just fine. My first time was about 5+ hours
-
I think my record was a 1 hour and 15 mins. But I did do a Vp-44 in 4 hours before lol. For me valve lash would take a while because I really like to double check that stuff. Speed comes with do
What's the normal time to change injectors for those of you who do it all the time?
Yesterday I changed injectors, set valve lash, and installed a Vulcan banjo bolt eliminator kit from filter to block mounted pump. Took about nine hours, though had Dirty Jobs and Strange Inheritance on in the background to distract me a few times.